Why we start with live power
The scarcest part of an AI factory isn’t the GPUs. It’s the megawatts behind them. So we begin where the power is already on.
The scarcest part of an AI factory isn’t the GPUs. It’s the megawatts behind them. So we begin where the power is already on.
6 posts
Rack-scale GPU systems changed the unit of design. A data hall is now planned around liquid, weight and power per rack, not floor area.
No shared tenancy, no noisy neighbors, no surprises in the scheduler. A cluster that’s yours, run by people who know it.
Between the last rack landing and the first job running, there’s a checklist. Here’s what’s on it, and why we don’t skip steps.

Training runs have a shape: a ramp, a long plateau and a tail. Capacity that fits that shape costs less than capacity that doesn’t.
Old industrial buildings were made for heavy loads, tall equipment and serious power. That makes them better starting points for AI than you might expect.